Update early February 2012

Early December the rubble has been removed which took 4 days. A large empty space has emerged. Temporary central facilities (kitchen, showers, toilets, office) for the 2012 season will be built up in March. A large tent of 10 x 15 meters will act as central building, which will house the shop as well. Part of the electrical cables and water pipes towards the camping site had to be replaced, as those were destroyed as well.

The new tents will be nearly the same as before, only the colour on the outside will be green (in stead of brown). On the floor there will be one big mattress (in stead of separate ones for each person) of 10 cm thick. The new restaurant tents will have the same size but the outside will be green while there are also two windows.